Assembly Instructions
It’s as simple as...

2 3 1
1. Apply the adhesive on the parts
to be bonded
2. Join tubes and fittings with a
twisting movement
3. Don’t touch the parts until
thoroughly cured

Application
Viscosity DIN
54453(mPa.s)
Bond
gap
Friction
Temperature
range
Final strength after

Cures quickly, extra strong, for joints exposed to
dynamic stress.

1500 - 3000
0.25
20 - 35
-50°C to +
150°C
approx.
12 hours
Adhere to the directions of use!

SWR Stainless Steel Balustrade Systems © Copyright 2010

Site Map | Terms and Conditions